Construction Updates

In 2005, construction of approximately 180,000 square feet of leasable space was completed for the new tenants: Bed, Bath & Beyond, Best Buy, Cost Plus World Market, Famous Footwear, Johnny Carino's Italian Restaurant, PETsMART, Quizno's and Starbucks.  The end of 2005 also concluded the completion of site work for Phase 1A consisting of underground utilities, parking lot lighting, asphalt and concrete, grading, common area security via closed circuit video, and landscaping.  The installation of the four-way traffic signal at the corner of Robal and Hunnell Road has proven to be a successful alternate route in moving traffic efficiently in and out of the shopping center. 

In addition to the completion of Phase 1, the storefronts of the existing tenants which included Food 4 Less, G.I. Joe's and Ross Dress for Less were significantly upgraded to match the newly constructed areas.

At the end of 2005, site work for Phase 2 of development, which abuts Highway 20, included the enclosure of the irrigation canal that runs through the Property and the addition of fill material to bring the Property to a ready-to-build grade.  As of February 2006, Phase 2 development has been brought up to grade and vertical construction will commence once tenant interest is further defined. 

The on-site Management trailer located at the northeast corner of the Property was moved this past April to allow for the completion of remaining asphalt, sidewalks and landscaping where the trailer resided.  The Management office is now located in the 2nd floor building across from Cold Stone Creamery inside the 'village' area. 

The 'village' portion of the Property was completed in January 2006.  The 'village' consists of +/- 65,000 square feet of retail space that highlights wide tree lined sidewalks, cement pavers, a center court fire and water feature, outdoor seating and Oregon craftsman themed architecture. At the end of the second quarter for 2006, the Property was 81% leased and/or occupied.
 
Construction of Buildings U&V (buildings adjacent to the 'village' area facing Highway 20) commenced in the first quarter of 2006 and is scheduled to be completed in September.  By the end of 2006, new asphalt, cement pavers, landscaping, lighting, video security and sidewalks will be installed for the southeast quadrant of the Property encompassing Buildings U&V.  Both new buildings are currently being marketed to prospective tenants and will add 24,973 square feet of leasable space to the center. 

Upon completion, the Property will encompass approximately 440,000 square feet.  Phase 1 consists of up to 380,000 square feet of leasable space on 34 acres and Phase 2 consists of up to 60,000 square feet of leasable space on the undeveloped adjacent seven (7) acres.  The to-be-developed portion of Phase 1 space consists of four (4) pad buildings encompassing +/- 49,000 square feet.  

FUTURE PHASES

The remaining Buildings not discussed herein will be developed upon future demand and/or securing a tenant for a space. 

 